UPDATE: College Ave. construction will prompt detours on several TCAT routes 7/16/18-7/18/18

UPDATE: Detour WILL NOT be lifted in afternoon as previously reported

Due to a water service installation project, College Ave. will be closed from Mon. July 16, through Wed., July 18, prompting several routes to detour. UPDATE: There will be no break in detour later in the day when construction ceases for the day as previously reported.

Route 10: From the Schwartz Center for Performing arts, will loop around the College Ave. circle, left onto Campus Rd., left onto Stewart Ave., and right onto Seneca St.

Route 10 will be unable to serve College @ Mitchell and State @ Quarry stops.

Routes 30, 32, 51 & 90:

Outbound: From State St. /MLK Jr., turn left onto Stewart Ave., right onto Campus Rd.

College Ave. and Carpenter Hall stops will be relocated to Campus @ College.

Inbound: From Campus Rd., turn left onto Stewart Ave., and right onto Seneca St.

College Ave. and Anabel Taylor Hall stops will be relocated to Campus @ College. Routes will serve Stewart @ Seneca and Stewart @ Williams in both directions. State @ Quarry stops will not be served in either direction due to the detour.

Posted in: