UPDATE: NYSEG construction to start week of 5/14/18 causing Routes 52 and Route 53 detours

NYSEG project slated for NYS Rt. 79 5/7/18 postponed

Due to NYSEG construction, NYS Rt. 79 (E. State St. /MLK) , between Mitchell St. and Pine Tree Rd., will be closed starting the week of May 14, approximately six weeks or until further notice.

Routes 52 and 53 will be detoured outbound from East State St. using Route 366 (Ithaca Rd. / Dryden Rd.), Maple Ave. and Pine Tree Rd. back on route to E. State St. (Inbound in reverse.)

Routes 52 (non-Cornell trips) will be unable to serve the following stops along the construction corridor to include: E. State/MLK @ Giles (outbound); E. State/MLK@ Cornell (inbound);  and Slaterville Rd. @ Honness; Slaterville Rd. @ Tower View; and Slaterville Rd. @ Lois-Commonland in both directions.

Route 53 will be unable to serve the following stops: Slaterville Rd. @ Honness; Slaterville Rd. @ Towerview; and Slaterville Rd. @ Lois- Commonland stops in both directions

TCAT apologizes for any inconvenience and thanks passengers for their patience.

 

Posted in: